Classic Rotary Phones Forum

Telephone Switching => Key Systems (Electronic, 1A2 etc) => Electro-Mehanical Key Systems (1A1, 1A2 etc) => Topic started by: Babybearjs on March 30, 2017, 03:24:28 PM

Title: getting it done, right.....
Post by: Babybearjs on March 30, 2017, 03:24:28 PM
well.... here are some photos of my home KTS now. I finally got the wood from my neighbor to make a backboard (painted it  White) and remounted my system shifting everything to the left side of the closet. now, I have the room to mount my 66 Blocks and clean up all the wiring....what a chore!
Title: Re: getting it done, right.....
Post by: Babybearjs on September 13, 2017, 02:46:24 AM
after so much trial and error.....and I do mean ERROR... I finally drilled a 2 1/2" hole in my floor and rewired the whole system. Now, everything is in 1 place instead of a daisy chained mess under my house.... each outlet location has it own run and wired into the 66 blocks by room... (living room, kitchen, etc.) I have the whole south side of the house done, now I just have to re-run the second living room, bedroom and Shed lines....(north side) Once that's done, then everything will be in this utility closet and easily trouble shot.... I also have 2 of 3 208A KTU's and may have to buy a rack system to house it all. I kept getting short on line 2 and it was frustrating trying to trouble shoot the problem..... Now that problem is solved and I won't have to fix this system again.... I even customized the 66 block by removing certain positions and grouping the block in 4 pair groups. The last positions are only for 2 pair circuits or special application use...my doorbell circuit for instance.... it does run 10 VAC....
Title: Re: getting it done, right.....
Post by: AE_Collector on September 13, 2017, 05:34:42 AM
There is no substitution for direct home runs to each location for trouble shooting and standardization purposes. Hopefully no more trips under the house for you!

Terry
Title: Re: getting it done, right.....
Post by: digoxy118 on September 13, 2017, 08:40:59 AM
Looks good! Takes patience I am sure.
Title: Re: getting it done, right.....
Post by: Babybearjs on September 13, 2017, 08:44:32 AM
my roommate was joking with me about being covered in cobwebs.... I hate crawling around under a house....
Title: Re: getting it done, right.....
Post by: Key2871 on March 20, 2018, 05:14:59 PM
Yea,  running to make connections in a damp location will cause you headaches. It's so much better to have all connections where you can get to them easy.
I remember a system in a crawl space that the company ran the key was in the damp location, and in the spring, cross talk was an issue that plagued the owner of a shop in town.
And plan plan plan, where and what your going to have. Back boards are the only way to go. For mounting other add one to your system. I must have done mine five times, before I finally got things right.

Life, it's all about experience, and learning from them.
You have a great system, and they are fun to play with.
Title: Re: getting it done, right.....
Post by: Babybearjs on February 04, 2020, 07:57:38 PM
I totally forgot about this thread... it shows what I HAD, but no new pictures since I redid the closet... I know I posted some pictures but missed this post... so.... this is what it looks like now... for those who have seen this already, just a recap... and I'm getting ready to reinstall my 208KTU bank of relays...
Title: Re: getting it done, right.....
Post by: Babybearjs on August 14, 2023, 02:39:25 PM
Where the alarm panel and ringer box are, they were taken out and 3 more 66 blocks were added and the 208 KTU array was added... the system is now complete. want to add pictures, but the files are too large to post...
Title: Re: getting it done, right.....
Post by: HarrySmith on August 14, 2023, 03:25:53 PM
You can always resize the pictures. We want to see them. This has come a long way from where you started. Nice work  ;D